Maintenance strategies and the P-F curve

The P-F curve is the single most useful picture in predictive maintenance. It tells you which technique to use, how often to measure, and how much warning you can expect.

Beginner14 min readInteractive

Four maintenance strategies

StrategyWhen work is doneWorks well forWeakness
Reactive (run to failure)After it breaksCheap, redundant, non-safety items such as light fittings or small duplicated pumpsUnplanned downtime, secondary damage, safety risk
Preventive (time-based)At fixed intervals of time, hours or cyclesFailures that really are age-related: wear liners, filters, lubricant top-up, beltsReplaces good parts, can introduce faults during intrusive work
Predictive (condition-based)When measured condition shows a developing failureFailure modes with a detectable warning period: bearings, gears, misalignment, electrical connectionsNeeds sensors, skills and a workflow to act on findings
Proactive (root cause)Before degradation starts, by removing its causeRepeat failures: precision alignment, balancing, lubrication cleanliness, correct installationNeeds discipline and evidence from the other strategies

A mature program uses all four. Predictive maintenance finds the developing failures; proactive maintenance removes their causes so they stop coming back.

Studies of airline equipment in the 1960s and 70s, later confirmed in other industries, found six patterns of conditional failure probability over the life of a component. Only a minority show a clear wear-out age.

PatternShapeShare in the original study
A · BathtubHigh early failures, constant, then wear-outabout 4%
B · Wear-outConstant, then rising sharply at a certain ageabout 2%
C · Gradual ageingSlowly rising, no clear wear-out ageabout 5%
D · Low when newLow at first, then constantabout 7%
E · RandomConstant probability at all agesabout 14%
F · Infant mortalityHigh after installation or overhaul, then constantabout 68%

The shares vary by industry, but the lesson holds: for most failure modes, replacing parts at a fixed age does not reduce failures and can increase them (pattern F). What does work is detecting the failure as it develops, which is exactly what predictive maintenance does.

The P-F curve

Most failures do not happen instantly. A defect starts, grows, and eventually stops the machine from doing its job. The P-F curve plots equipment condition against time along that path:

  • P (potential failure) is the earliest point at which you can detect that the failure is developing, with a given technique.
  • F (functional failure) is the point where the asset no longer does what you need it to do.
  • The P-F interval is the time between them: your warning period.

Different techniques detect the same failure at different points. Ultrasound and vibration usually see a bearing defect months before it gets hot; temperature and noise see it days or hours before failure. The earlier the technique, the more time you have to plan.

P-F curve: technique and measurement intervalInteractive
30 days
P-F interval (typical)
–
Longest safe interval (P-F ÷ 2)
–
Worst-case warning left
–
Verdict
–
Try it: pick vibration and stretch the interval past half the P-F interval: the worst-case warning time shrinks until a failure can develop entirely between two measurements. Then pick temperature: even daily checks leave very little time to plan. P-F values here are typical midpoints; real values depend on the machine, the failure mode and the operating conditions.

Setting the measurement interval

The classic rule from reliability-centred maintenance is: measure at intervals no longer than half the P-F interval. If a defect can appear just after a measurement, a half-interval rule still gives you at least one detection and half the P-F interval to plan and act.

In practice:

  • Use the shortest credible P-F interval for the failure mode, not the average, especially on critical assets.
  • Subtract the time you need to act: analysis, approval, parts, scheduling a stop. The usable warning is the P-F interval minus one measurement interval minus that lead time.
  • Fast-developing failure modes (lubrication loss, cavitation, process upsets, electrical faults) can have P-F intervals of days or hours. Only online monitoring catches them reliably.
  • Variable or intermittent duty shortens effective intervals: a machine that runs one shift a day only produces useful data when it runs.
TechniqueTypical P-F range (indicative)Monthly route enough?Online (wireless) helps when…
Ultrasound3 to 9 monthsOften, for bearings and lubricationBearings are slow, remote or lubricated automatically
Vibration1 to 9 monthsOften, for standard-speed balance-of-plantAsset is critical, hard to reach, unsafe to approach, or runs intermittently
Oil analysis1 to 6 monthsMonthly to quarterly sampling is commonLarge gearboxes, hydraulics and turbines with high contamination risk
Motor current1 to 6 monthsYes, for rotor and eccentricity faultsMotor is remote, submerged or in hazardous areas; load varies
Thermography1 week to 2 monthsQuarterly to annual electrical surveys are commonCritical switchgear, kilns, conveyors with fixed cameras
Temperature1 day to 2 weeksNoAlways online: it is the late safety net

Where wireless changes the economics

A monthly route is limited by the walking time of a technician. Wireless sensors make hourly or daily measurement cheap, so the measurement interval stops being the weak link. The P-F interval then mostly limits how far ahead you can plan, not whether you detect the fault.

The cost of waiting

The further a failure progresses down the curve, the more it costs: early detection means a planned bearing change; late detection means a damaged shaft, a burnt winding or secondary damage to the driven machine, plus unplanned downtime. That cost curve is why early techniques are worth the effort for critical assets.

Key takeaways

  • Only a minority of failure modes are age-related, so condition-based maintenance fits most of them.
  • The P-F interval is the warning time between detectable and failed. It depends on the technique.
  • Measure at intervals no longer than half the shortest credible P-F interval.
  • Wireless online monitoring removes the measurement interval as the limiting factor.